Procedure # |
Procedure Title | Rev |
Effective Date |
Gas Injection System |
1.0 |
7/00 |
|
PPE Requirements |
1.0 |
7/00 |
|
Operator Logs |
4.0 |
7/00 |
|
|
|||
Startup and Shut Down Checklist |
3.0 |
7/00 |
|
Unattended Operations |
3.0 |
7/00 |
|
|
|
|
|
Acceptance Testing Document (ATD) |
1.0 |
7/00 |
|
Corrosion Cell Assembly |
3.0 |
7/00 |
|
Furnace Operation |
3.0 |
7/00 |
|
Corrosion Cell Disassembly |
2.0 |
7/00 |
|
Corrosion Sampling |
2.0 |
7/00 |
|
Pb – Tapping |
4.0 |
01/01 |
|
NaOH/Pb Corrosion Cell Assembly |
4.0 |
01/01 |
|
Pb and NaOH Sampling |
4.0 |
01/01 |
|
Gas Handling Train |
2.0 |
7/00 |
|
Ventilation |
2.0 |
7/00 |
Rev. 0.0 Was the initial set of procedures submitted to the IHRG committee, on 10/11/99 .
Rev. 1.0 Incorporated the corrections, comments, suggestions, requirements as provided by Gary Roberts and Doug Ardary, completed 10/26/99 .
Rev. 2.0 Incorporated the corrections, comments, suggestion from the second IHRG review held on April 24, 2000 .
Rev. 3.0 Incorporated corrections based on experimental runs 1 and 2.
Rev. 4.0 To expand the use of these SOP's for use in the IHRG Titled: “Clean-up Pb-Bi Coolant” MSN-00-872. Procedure 200-05 was modified (per Gary Roberts's recommendation during the IHRG. Procedures 200-6 and 200-7 were added and reviewed during the IHRG. Procedure 100-3 were updated to reflect the Mass Spec.